Thursday 7 March 2013

What I plan to do (pics of the bungalow as it is)


The bungalow looks as though it hasn't been touched since 1972. The fuse box is from around 1960, there is a hot water tank, but no boiler.

There is a gas fire in the lounge and the bedrooms have electric wall heaters. I intend to completely rewire  the bungalow .I will have Lutron Lighting in the lounge and master bedroom.

I will remove the electric wall heater and install Gas Central Heating , with a combi boiler for heat and hot water.

My plans are to extend along the side and the rear. The door is currently on the side of the bungalow. By extending the side I will put the entrance door along the front.


This will also create a small hall which will have a shower room which the downstairs bedroom can access . Past the shower room will be a small study. 

I will remove the current walls which divide the lounge from the bathroom and kitchen and open this up completely. An extension along the back and the rest of the side extension will make up the kitchen , lounge diner.











There will be 6 meter bi fold doors and a roof lantern in the rear extension.

There are currently two bedrooms but I will remove the dividing wall and convert that into one large bedroom ( further bedroom will be in the loft).




Stairs for the loft will be accessible from the lounge. The loft will have the master bedroom, en suite and walk in wardrobe. 


There will be a small server under the stairs that will feed audio and video to all the rooms.

1 comment: